KA Donrath
Bombas de Tornillo
Spaans Babcock received in 2012 the order from Stulz – Planaqua for the construction of a RAS pumping station with 3 Archimedean Screw Pumps and a Inlet Pumping Station with 3 Archimedean Screw Pumps as part of the the extension of the Sewage Treatment Works in Donrath Germany. All pumps were delivered with a steel trough. The steel trough was backfilled with concrete by Spaans Babcock. After succsesfull performance trials the plant was handed over to the customer in October 2013.
Technical Data:
Data: Installed Power [ Kw]: Deisgn flow rate [m³ / s]: |
2013 30 0,22 |
Angle [º] Screw diameter [m] |
35 1,1 |
Data: Installed Power [ Kw]: Deisgn flow rate [m³ / s]: |
2013 37 0,38 |
Angle [º] Screw diameter [m] |
35 1,5 |
< Volver a la vista general